Vivid H2O Solutions has been delivering water treatment solutions in Sagar since 2017. With 34 installations covering 5 solution types, we bring proven expertise to every project in the region.
This 04 KLD STP commissioned in Sagar employs proven biological treatment processes, designed to support compliant discharge with efficient energy consumption and low chemical dependency.
Serving Sagar since 2025, this 05 KLD sewage treatment plant was designed with low-maintenance aerobic treatment technology, built to deliver consistent effluent quality with minimal operator intervention.
Installed in Dec 2025 for a Sagar industrial unit, this 03 KLD ETP features primary and secondary treatment stages engineered to reduce chemical oxygen demand and total suspended solids effectively.
Serving Sagar since 2025, this 1000 LPH RO plant was configured based on site-specific water analysis, incorporating appropriate pre-treatment to ensure optimal membrane longevity and water quality.
This 1000 LPH reverse osmosis installation in Sagar features automated operation with low-pressure cutoff protection and TDS monitoring, designed to deliver safe drinking water with minimal manual oversight.
| Plant Type | Capacity | Period |
|---|---|---|
| ETP | 25 KLD | Jul 2025 |
| STP | 80 KLD | Nov 2024 |
| RO Plant | 1000 LPH | May 2024 |
| ETP cum STP | 05 + 10 | May 2024 |
| ETP | 05 KLD | Oct 2023 |
| ETP | 2 KLD | May 2023 |
| STP | 120 KLD | Dec 2022 |
| RO Plant | 1000 LPH | Dec 2022 |
| STP | 05 KLD | Jan 2022 |
| STP | 20 KLD | Dec 2021 |
| RO Plant | 250 LPH | Oct 2021 |
| STP | 05 KLD | Sep 2021 |
| STP | 5 KLD | May 2021 |
| STP | 05 KLD | Mar 2021 |
| STP | 15 KLD | Oct 2020 |
| ETP | 2 KLD | Oct 2020 |
| ETP cum STP | 30KLD/7KLD | Oct 2020 |
| STP | 10 KLD | Jul 2020 |
| Water Cooler | 20liter | Sep 2019 |
| STP | 05 KLD | May 2019 |
| STP | 05 KLD | Mar 2019 |
| STP | 03 KLD | Dec 2018 |
| STP | 05 KLD | Dec 2018 |
| RO Plant | 1000 LPH , 02 TR | Dec 2018 |
| ETP | 01 KLD | Dec 2018 |
| STP | 05 KLD | Jul 2018 |
| ETP | 01 KLD | Feb 2018 |
| STP | 05 KLD | Dec 2017 |
| STP | 05 KLD | Jun 2017 |